50kw Air Cooled Chiller ,Procedure for first start or debugging
A. After finishing electrical wiring, please check especially whether the circuit breaker meet requirements, whether peripheral equipments are connected correctly according to the electric wiring diagram;
B. Compressor oil heater is powered on and heated at least for 8 hours.
C. Check and make sure that all valves of refrigeration system and water valves are fully open, water flow switch and the water inlet valve and so on are in good condition;